项目质量持续改进的工作流程包括:(1)改进策划,(2)识别改进机会,(3)改进效果的度量,(4)改进的实施和监控。其具体顺序为:()
A.(1)(2)(3)(4)
B.(4)(3)(2)(1)
C.(2)(1)(4)(3)
D.(2)(1)(3)(4)
正确答案是C