当前位置:首页 > 笔试(00004) > 正文内容

The construction of the library_______ before the end of next month.

高老师2年前 (2024-03-27)笔试(00004)9

The construction of the library_______ before the end of next month.

A.must have completed

B.must have been completed

C.must be completed

D.must complete

正确答案是C

扫描二维码免费使用微信小程序搜题/刷题/查看解析。

版权声明:本文由翰林刷题小程序授权发布,如需转载请注明出处。

本文链接:https://doc.20230611.cn/post/752201.html

分享给朋友: