在规划、项目和建设地点已定的情况下,()是建设项目能否在实现功能要求的同时实现综合经济效益的决定性环节。
A.项目建设书
B.可行性研究报告
C.编制设计文件
D.编制年度计划
正确答案是C
扫描二维码免费使用微信小程序搜题/刷题/查看解析。
版权声明:本文由翰林刷题小程序授权发布,如需转载请注明出处。
本文链接:https://doc.20230611.cn/post/745651.html
上一篇:Energy sources may initially be divided into two kinds: non-renewable and renewable. The former group includes coal, oil, gas and, in the long run, nuclear; the latter waterpower, solar power and wind power. The energy from all these sources ultim
Energy sources may initially be divided into two kinds: non-renewable and renewable. The former group includes coal, oil, gas and, in the long run, nuclear; the latter waterpower, solar power and wind power. The energy from all these sources ultim
下一篇:参与式报道策划应把握的要点有