计算“基础梁配筋图”(见第9页) 轴线上的现浇C25混凝土基础梁工程量。(计算结果保留3位小数)
C轴:S截=0.2X0.4=0.08m2,L=3.3-0.6+4.7-0.3-0.25=6.85m,V=0.08X6.85=0.5483.
扫描二维码免费使用微信小程序搜题/刷题/查看解析。
版权声明:本文由翰林刷题小程序授权发布,如需转载请注明出处。
本文链接:https://doc.20230611.cn/post/1172915.html
上一篇:Complete the following sentence with a (compound) word derived from the one(s) given in bracket. ( ) actions often result in disaster. (ill, consider)
Complete the following sentence with a (compound) word derived from the one(s) given in bracket. ( ) actions often result in disaster. (ill, consider)
下一篇:联系实际谈谈在管理实践中如何有效运用强化理论开展激励工作。